Answers

Kitchen and Shower Remodeling Questions

Straight answers about planning, timing, permits and what to expect. City specific detail is on each area page, and Arlington costs and permits are on the Arlington kitchen remodeling page.

Planning

Planning a Kitchen

Where should I start with a kitchen remodel?

With what bothers you about the current room: storage, light, workspace or flow. That shapes the layout before any finishes.

How far ahead should I plan?

Several weeks for design and selections, plus cabinet lead time, before construction starts.

Should I choose appliances first?

Yes, at least sizes. Cabinet openings and electrical or gas needs depend on them.

Is an open kitchen always better?

Not always. Open plans spread cooking smells and noise; a partial opening or pass through can be a good middle ground.

What countertop is easiest to live with?

Quartz needs little upkeep. Natural stone needs periodic sealing.

How much contingency should I keep?

Older homes justify a reserve for hidden conditions such as old wiring or damaged subfloor.

Showers and tubs

Shower and Tub Replacement

Should I keep one bathtub in the house?

Families with young children often want one; many owners convert a second tub to a shower.

Is a curbless shower possible in an older home?

Sometimes. The floor has to be recessed, which depends on the framing below.

What makes a shower last?

Proper waterproofing behind the tile and a correctly sloped pan or base.

How long am I without a shower?

Panel systems often finish within a few days, while tile needs extra setting and curing time and runs longer.

Rules

Permits and Licensing

What Virginia license does a kitchen remodeler need?

Class C covers single jobs over $1,000 and under $30,000, Class B from $30,000 to under $150,000, and Class A $150,000 or more.

When does a kitchen remodel need a permit?

When plumbing moves, circuits are added, gas lines are run or walls come out. Like for like cabinet and counter replacement usually does not.

Are Maryland rules different?

Yes. Maryland contractors need an MHIC license, and deposits are capped at one third of the contract price.

What about older homes and lead paint?

Homes built before 1978 require lead safe work practices when painted surfaces are disturbed.

Have a Question We Didn’t Answer?

Call and ask about your kitchen or shower.

Ava Kitchen Remodeling · 5054 Langston Boulevard, Arlington, VA 22207 · (571) 653-5931

Ask a questionCall (571) 653-5931